On our last trip to Sydney we brought back a set of steps and today is the day they will be installed.
There was timber and a large rock step and we added the iron, but it was time to go as it is a good place for a snake to hang out and im not a fan of snakes as most of you know, and spring is here and so is the warn weather.
Away went the rock and the iron, with a few Red Backs on the underside.
Next the old timber was prised up.
All raked up and ready.
First Andrew add a piece of timber under the edge of the floor.
Added a second piece of timber in front. The timber is Yellow Box that Andrew milled.
Again drilled and using hex screws to attach.
Next drilled holes in the top to hold the stairs in place, sorry didn't take a picture of that bit.
Levelled the dirt and attached the stairs, added a couple of paver's at the bottom.
We may add some gravel as its a bit muddy.